Day0
Budget$0k
Early spend$0k
Humans in loop5
Team10 eng

How to read the floor

  1. Boxes are tasks. Find the machine with a full meter and a growing pile in front of it. That is the constraint.
  2. The optimizations for each machine are listed in the column under it. Hover one to read it, click to install. Ten days later the log says whether shipped tasks per day moved, and the sparklines show it.
  3. Money spent anywhere else is early spend. You may need it later, but today it buys nothing.
  4. When one pile drains, another starts. Go back to step 1.
  5. Every signal has a traffic light: green is healthy, amber is worth watching, red is a problem. Hover a signal to read what it means and what usually fixes it.
  6. Red boxes on the top pipe are rework going back to Code. A red beacon means an incident has stopped a station. Wait it out, or pay to clear it from that station's column.
  7. Each person on the floor is a human gate. Automate the gate and they go home. You win when all five lamps are out.

Diagnose my factory

Enter rough numbers for your own team. The simulator starts from your line, names your constraint today and suggests the first three moves.

Lights out

Shift report card