Draft, open for argument

Adapt the line you have

A software factory is your existing SDLC with the waiting removed. It is a series of changes to it.

The rule

Existing organisations do not get to start over. The stations stay: someone specifies, something builds, something verifies, something ships. What changes is who stands at each station and how long work waits there.

Signs you are breaking it

  • A plan to switch to an AI-native process next quarter.
  • A pilot team working in a way nobody else can adopt.
  • Agents bolted on while every gate around them stays manual.

In Lights Out

The seven stations never change. Only their capacity and the people standing at them do.

Back to all factors